L&T concludes the divestment of 99 MW Hydro Power Plant with Renew Power
Mumbai August 31, 2021: L&T concluded the divestment of its 100% stake in the 3 x 33 MW (99 MW) hydroelectric power plant at Singoli-Bhatwari in Uttarakhand.
L&T concludes the divestment of 99 MW Hydro Power Plant with Renew Power