Larsen & Toubro
About Us
The L&T Group
Overview
Innovation
Awards & Recognition
Annual Review
Corporate Policies
Leadership
Board of Directors
Chairman Emeritus
Businesses
Sustainability
Careers
Overview
Campus Engage
Learning & Development
Diversity, Equity & Inclusion
Renew
Recruitment Caution
Investors
News & Stories
Contact Us
Investors
News & Stories
Contact Us
  • Corporate
  • Press Releases
  • L&T Construction secures (Large*) order for its Transportation Infrastructure Business (TI)
About L&T Group
Overview
Innovation
Awards & Recognition
Annual Review
Board of Directors
Chairman Emeritus
Corporate Policies
Businesses
Construction
Energy
Manufacturing
Services
Allied Businesses
Careers
Overview
Campus Engage
Learning & Development
Diversity, Equity & Inclusion
Renew
Recruitment Caution
Contact Us

View all Contacts

Larsen & Toubro Limited
CIN – L99999MH1946PLC004768
L&T House, N.M. Marg, Ballard Estate, Mumbai, Maharashtra - 400 001

Tel: +91 22 67525656
Fax: +91 22 67525858
Send us a mail: infodesk@larsentoubro.com

Sustainability

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 LARSEN & TOUBRO LIMITED. All rights reserved.

L&T Construction secures (Large*) order for its Transportation Infrastructure Business (TI)

  • 06 February 2024
  • Download PDF

Mumbai: The Transportation Infrastructure Business of L&T Construction has won a prestigious project contract to construct the Palashbari to Sualkuchi Cable-Stayed Bridge across the river Brahmaputra in Assam.

The project has been awarded by the Public Works Roads Department (PwRD), Assam to construct a 12.21 km bridge with approaches connecting Palashbari and Sualkuchi. The bridge will directly connect both the towns.

The village of Sualkuchi is one of the world’s largest weaving centres where traditional Assamese garments are made with indigenous materials like Muga, the golden silk, which is produced only there. The bridge will also directly connect to the Lokpriya Gopinath Bordoloi International Airport (GAU), Assam.

The project will have 3.6 km cable-stayed bridge portion along with a 5.61 km approach on Palashbari side and a 3.0 km approach on Sualkuchi side including wetland approach viaducts. The maximum span of the extradosed cable-stayed portion will be 165 m. The project is scheduled to be completed in 48 months.

L&T is already executing the ‘Dhubri Phulbari Bridge Project’ for National Highway Infrastructure Development Corporation (NHIDCL) apart from several other infrastructure projects in Assam.

TAGS :

  • #LarsenToubroNews
Background:

Larsen & Toubro is a USD 23 billion Indian multinational engaged in EPC Projects, Hi-Tech Manufacturing and Services. It operates in over 50 countries worldwide. A strong, customer–focused approach and the constant quest for top-class quality have enabled L&T to attain and sustain leadership in its major lines of business for eight decades.

*Project Classification

 

Project ClassificationSignificantLargeMajorMegaUltra-Mega
Value in ₹ Cr1,000 to 2,5002,500 to 5,0005,000 to 10,00010,000 to 15,000>15,000

Media Contacts:

Sumeet Chatterjee

Head - Corporate Brand Management & Communications

Sumeet.Chatterjee@larsentoubro.com

  • Share ButtonShare ButtonShare ButtonShare Button