Search Results

  • All L&T Campuses Achieve Water Positive Status

    Water positive status is conferred upon a manufacturing location only when the amount of water withdrawn for industrial usage is less than the amount of water given back to society and nature. We at L&T have always recognized water stewardship as a key driver for a sustainable business, and have constructed water harvesting structures and water treatment and recycling facilities across our campuses in India.

    Read more
  • L&T-Sargent & Lundy wins CII award

    L&T-Sargent & Lundy has been conferred the CII-BE Star Recognitions for Excellence in Customer Management-2017 as ‘Emerging Leader’ in services sector by the Confederation of Indian Industry (CII). The award ceremony was held at the 25th National Quality Summit in Bengaluru on November 25 & 26, 2017.

    Read more
  • L&T Construction awarded another (Significant*) contract for Chennai Metro Rail Project

    Mumbai, May 30, 2022: Larsen & Toubro has secured one more package in the Chennai Metro Rail Projects. L&T has been awarded Package C3 (CP08 EV01) of Phase-II Chennai Metro Rail Projects.

    Read more
  • L&Teers – at the heart of L&T

    What does one do when faced with issues of abject poverty or social deprivation? If you are an L&Teer you address the issues by working closely with those affected.

    Read more
  • L&T Flags Off Reactors to Mexico’s Second Largest Refinery

    Hazira (Surat, Gujarat), June 2, 2023: The Heavy Engineering arm of Larsen & Toubro, flagged off 5 nos. reactors for PEMEX’s Miguel Hidalgo (Tula) refinery in Mexico. These equipment will be dispatched to Pemex Transformación Industrial (PTRI), a subsidiary of Mexico’s state-owned oil company PEMEX (Petróleos Mexicanos).

    Read more
  • L&T Wins (Significant*) Order for Agra Metro Network

    Mumbai, Oct 16, 2024: The Heavy Civil Infrastructure vertical of Larsen & Toubro has secured an order from Uttar Pradesh Metro Rail Corporation Ltd (UPMRCL) for the design and construction of Agra Metro Phase 1, Line-2. The stretch will run from Agra Cantonment to Kalindi Vihar.

    Read more
  • L&T Construction awarded yet another contract (Large*) in the Bullet Train Project

    Mumbai, Dec 05, 2022: The Buildings & Factories Business of L&T Construction has secured an order from the National High-Speed Rail Corporation Limited (NHSRCL) to construct the Sabarmati Depot (MAHSR – D-2) in the state of Gujarat for the Mumbai – Ahmedabad High Speed Rail (MAHSR) project through a consortium led by Sojitz Corporation, Japan.

    Read more
  • 2016-11-22-L&T Construction Wins Orders Valued Rs. 1926 Crores (1)

    Download
  • L&T Semiconductor Technologies

    .

    Read more
  • L&T Construction Awarded (Significant) contracts for its Various Businesses

    Mumbai, April 07, 2022: The construction arm of Larsen & Toubro has secured orders for its various Businesses.

    Read more
Image Loader
  • Company Logo

You are using an outdated browser. Please Update your browser to improve your experience.